Engineeric Solutions - your partner in turnkey engineering solutions
  • Home
  • About
  • Services
    • Green Energy
    • Steam Line Installatons and Surveys
    • Boiler Services
    • Specialized Welding and Pressure Vessels
    • Repair Services
    • General Engineering and Fabrication
    • Statutory Inspections
    • Utility Piping and Insulation
    • Construction and Other Services
  • Contact
Our Services

Steam Line Installations and Surveys

Contact Us
Steam Line Design and Stress Analysis
Steam Line Surveys and Assessments
Service Level Contracts
Steam Line Design and Stress Analysis

 

Built with premium Mild Steel & Stainless-Steel components, our Steam and Condensate lines feature premium  valves and fittings with master workmanship to ensure a leak free steam system that delivers maximum return on  investment.

Pipe sizing is a crucial aspect of steam system design. 

Oversized pipework means: 

  • Pipes, valves, fittings, etc. will be more expensive than necessary. 
  • Higher installation costs will be incurred, including support work and insulation.
  • For steam pipes, a greater volume of condensate will be formed due to the greater heat loss. This means that more steam trapping will be required.

Undersized pipework means: 

  • Lower pressure might be available at the point of use, which may hinder equipment performance. • There is a risk of steam starvation due to an excessive pressure drop. 
  • There is a greater risk of erosion, water hammer and noise due to the inherent increase in steam velocity. 

 

siFramo Installation Example_1
Steam Line Surveys and Assessments

 

High energy prices and global competition dictate a need to reduce energy waste and improve system efficiencies  whenever possible. Steam, aside from being one of the costliest utilities, is an essential component of  product quality in many processing industries.

A major contributor to waste and inefficiency is leaks; both to atmosphere and through valves and steam traps. Improvements to the steam system may include insulating steam  and condensate return lines, stopping any steam leaks, and maintaining steam traps.

Experts have also said that as  much as 20% of the steam generated at the central boiler is lost to leaking or failed steam traps. The purpose of a successful steam trap inspection programme should be to repair any faulty steam traps and leaks that can affect safety, to reduce energy waste and promote sustainability as well as product quality.

 

Service Level Contracts

 

Production delays aggravated by poor service planning are both costly and frustrating. Steam Generation endeavors  to provide an efficient service for our customers. Service contract are offered to clients all over South Africa to allow  our customers to do what they are good at and not have to worry about the heart of their production generating  steam or hot water – that’s our job.

Contact us

Engineeric Solutions - logo (2)-1

 

Connect with us
 
info@engineeric.co.za
 
General: +27 10 054 7760 
Services: +27 63 925 2493
Installations: +27 60 521 6775
 
Services
  • Green Energy
  • Boiler Services
  • Repair Services
  • Statutory Inspections
  • Utility Piping and Insulation
  • Construction and Other Services
  • Steam Line Installations and Surveys
  • General Fabrication and Engineering
  • Specialized Welding and Pressure Vessels
Legal
  • Privacy Policy
Navigation
  • Home
  • About
  • Services
  • Contact

©2025. All rights reserved